Eastern Creek to Five Dock Infrastructure Build
Xenith IG hired ROC Communications for a 30km infrastructure project between Eastern Creek and Five Dock, Sydney, installing multiple conduits and concrete pits through a high-density urban corridor.
Project Challenges
- Urban Congestion: Managed heavy traffic, limited access, and utility congestion.
- Stakeholder Coordination: Collaborated with councils and authorities, navigating environmental and cultural considerations.
- Complex Infrastructure: Worked near critical services, including high-voltage power and gas lines, requiring precise execution.
ROC Approach
ROC performed extensive pre-construction surveys, using non-destructive technology and subsurface scanning for accuracy. A traffic plan minimized disruptions, and in-house crews collaborated with subcontractors for specialized tasks, ensuring transparent progress and adherence to timelines.
Results
ROC completed the project on schedule and within budget, exceeding client expectations with minimal infrastructure impacts and strengthened stakeholder
relationships, reinforcing ROC’s reputation for urban infrastructure projects.
Services Provided:
Conduit & Pit Installation and Surveys
Scope and Duration:
30km Urban Project in Sydney – 6 Months
Complexity:
Urban congestion, stakeholder coordination, and critical infrastructure challenges
Workforce:
30 skilled technicians